Significant Achievements

Significant Achievements:
  • Completing the installation of a 3 million dollar cardboard corrugator unit at Carter Holt Harvey, Case Mangere on day 29 of the 30 day project deadline. The projected 1460 man hours on-site grew to 2436 in the same time frame. This project was carried out in our first year of business.
  • The joining of 5 sections of a 300 year old Kauri Tree for the Auckland Regional Council's Aratahi Visitor Information Centre.
  • On-site machining of bush bores on the 420 tonne Marion Free Shovel and Downers Mining Waipuna mine for W.S. Stevenson Ltd.
  • Propeller shaft re-alignment for a tuna boat company at Port Lincoln in South Australia
  • The relocation and installation of the Roland 700 printing machine from Germany to Auckland for Interpact Packaging involving 1800 man hours
  • The relocation of two factory sites containing 22 separate machines to their new single sight taking 525 man hours in five days
Hydro Power Generation:
  • Tokaanu and Maretai wicket gate alignment and lineboring
  • Hours involved: 400 man hours, 250 on-site and 160 off-site
  • "The success of the work carried out can be attributed to a great team effort and communication combined with excellent co-operation between Active Engineering and Century Resources" - John Barrat (now MB Century)
Marine Propulsion - Ocean Trilogy:
  • 200 man hours in 7 days
  • Re-alignment and lineboring of 100mm dia x 12m long propeller shaft bearing bores
  • After trials, the vessel achieved a 40% reduction in vibration and a 2% fuel saving
FOLLOW ACTIVE ENGINEERING
  • ico-fb
  • ico-in
  • Instagram-435
  • Prequal logo-798-894
 
CONTACT
Phone 09 478 7880
   
Email info@activeengineering.co.nz
19 Parkway Drive
Mairangi Bay
Auckland
 
HOURS
Monday to Friday 7:00am - 4:30pm
Weekends By arrangement

After hours emergency service available:
phone (09) 478 7880.