Gate alignment
for hydro power station
|
 |
|
Relocation of
Roland 700 Printing machine from Germany
to Auckland
|
|
Engineering Projects
Active Engineering has been involved in many
major engineering projects including...
Hydro Power Generation
- Tokaanu and Maretai wicket gate alignment
and lineboring
- 400 man hours, 240 onsite and 160 offsite
- "The success of the work carried out
can be attributed to a great team effort and
communication combined with excellent co-operation
between Active Engineering and Century Resources"
- John Barrat (now MBCentury)
Roland 700 Printing Machine - Interpac
- Relocation from Germany to Auckland, New Zealand
- 1800 man hours
- Inspection and dismantling in Germany followed
by a major overhaul of all units prior to installation
in West Auckland
- This included dry ice cleaning, air line,
cylinders and operating system re-build, roller
reclamation and drive motor reconditioning
Factory Relocation - Fintech
- 525 man hours in five days
- Relocation of two factory sites containing
22 separate machines to their new single site
Marine Propulsion - Ocean Trilogy
- 200 man hours in 7 days
- Re-alignment and lineboring of 100mm dia x
12 metre long propeller shaft bearing Bores
- After trials the vessel achieved a 40% reduction
in vibration and a 2% fuel saving
|